88Soul Score
Structural
92
Systems
87
Legal
95

2847 Laurel Canyon Blvd

Los Angeles, CA 90046

Live

Estimated Value

$850,000+4.2%
Equity Built$312k · 37%

Mortgage remaining: $538,000

Sq Ft

2,840

Bed / Bath

4 / 3

Year Built

1999

Passport ID:HP-2847-LAC-1999-X9

Community Impact

How this home gives back

12

Local Trades Supported

Plumbers, electricians, roofers in your ZIP

−15%

Carbon Footprint Reduced

vs. avg LA home · solar + Powerwall combo

$73k

Invested in Local Economy

Total contractor spend since 1999

26 yrs

Community Member

Protecting this home since 1999

The Story of This Home

A living history since 1999 · 9 chapters

27 yrs
1999

The Beginning

Home constructed and first family moved in. HomePassport begins its watch.

2003

First Renovation

Kitchen updated, new oak hardwood floors installed throughout the ground floor.

2008

Solar Panels Installed

12-panel array added — one of the first on the street. Energy independence begins.

2012

Master Suite Addition

800 sq ft addition: master bedroom, walk-in closet, ensuite bath.

2015

Roof Recertified

Full GAF Timberline re-lay with 25-year warranty. Structural A-rating retained.

2019

New Ownership

Property transferred to current owners. Full HomePassport audit completed.

2022

Smart Home Upgrade

Nest, Ring, Lutron Caseta, and Tesla Powerwall 3 fully integrated.

2025

Tesla Powerwall 3

Battery storage expanded to 13.5 kWh. Grid export enabled. Carbon-neutral since.

2026

Kitchen Remodel

Full gut renovation: Sub-Zero fridge, quartz counters, custom cabinetry. +$70k value.

Maintenance Outlook

Next 6 months · 7 tasks upcoming

Mar 202612d
Critical

Roof Inspection

Annual integrity check — 6 yrs post-install

Est. cost$250–$400
Mar 202618d
Routine

HVAC Filter Swap

MERV-13 swap, 90-day cycle

Est. cost$45
Apr 202642d
Energy

Solar Panel Cleaning

Estimated 8% efficiency gain post-clean

Est. cost$150
Apr 202655d
Routine

Gutter Clearing

Pre-season debris removal and flow test

Est. cost$120
May 202672d
Routine

Water Heater Flush

Sediment removal extends lifespan 3–5 yrs

Est. cost$80
May 202690d
Energy

Battery Health Check

Tesla Powerwall calibration cycle

Est. costFree
Jun 2026105d
Critical

Deck Inspection

Wood rot assessment + sealant reapplication

Est. cost$200–$600

System Vitality

Live health across 4 major systems

HVAC System

Carrier Infinity 24

Healthy
82%life remaining
Last serviced Jan 15, 2026
Filter due in 18 days

Roof

GAF Timberline HDZ

Certified
2030certified until
Cert valid through Dec 2030
No active leak warnings

Solar & Battery

Tesla Powerwall 3 + 22 Panels

Generating
12kWh today
Battery: 94% charged
Grid export: $14.20 today

Electrical

200A · Tesla Wall Connector

Online
18kWh drawn
Wall Connector: Active
Peak demand: 6:30 PM